Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The Process Manager starts. The left hand side shows all available datasets, in this case only our Ships object. The right hand side shows the available tasks. The parameters in the Top Goals class are shown here, as well as existing solutions. A combination of a dataset and a task results in a solution.

Info

A combination of a dataset and a task results in a solution.

 

 

Figure 10   The process manager with datasets (left) and solutions (right)

...

Image Added

  • In the Process Manager, select Ships:#1 as dataset and B_Frame as task. Click the Compute B_Frame button. Data that is available in the dataset is proposed together with data still to be given (figure 11).

Figure 11   Data that is available in the dataset is already filled in 

...